First The surface is cleaned of debris, grease, or dust by mechanical forces ( grinding or shot-blast).
Second, the area is Vaccum to ensure all loose particles are removed from the subfloor and
Third primer is applied to ensure good adhesion.
Mixing the Compound: The cement self-leveling mixture is prepared using a drill and mixing paddle for consistency.
The compound is poured or pumped onto the floor, where it spreads out naturally due to its liquid form. Any adjustments are made with a trowel.
Before proceeding with flooring installation, our team conducts a thorough inspection to ensure the surface is perfectly smooth, level, and meets your specific requirements. We carefully check the floor's flatness and overall quality, addressing any inconsistencies to provide a flawless foundation for your flooring.